Farming in the two counties around Greer
| 2022 Census of Agriculture | Greenville County | Spartanburg County |
|---|---|---|
| Farms (change since 2017) | 920 (-11%) | 1,230 (-14%) |
| Land in farms | 52,688 acres | 97,644 acres |
| Average farm size | 57 acres | 79 acres |
| Market value of products sold | $26.3 million | $47.0 million |
| Farms selling under $2,500 | 56% | 56% |
| Nursery, greenhouse, floriculture, sod | $7.6 million | $11.4 million |
| Fruits, tree nuts, berries | $5.7 million | $16.1 million (3rd in SC) |
| Livestock, poultry and products | $3.6 million | $12.4 million |
| Irrigated land | 1,702 acres | 2,625 acres |
USDA NASS, 2022 Census of Agriculture county profiles, retrieved 5 October 2026.
Which farms near Greer are a good fit for solar?
Solar pays where a farm uses a lot of power in daylight, all year, and uses it on site. Near Greer that points to greenhouses and nurseries with fans, lighting and pumps, packing and cold storage for fruit, and irrigated vegetable operations.
Irrigation is limited: about 1,702 acres in Greenville County and 2,625 in Spartanburg, roughly 3% of farmland in each. A pump that runs a few weeks a year rarely justifies its own array.
Poultry and eggs brought in only about $440,000 in Greenville County in 2022, and NASS withheld Spartanburg’s figure for confidentiality, so a poultry-house solar case has little footing here.
Cattle and hay operations usually have small, scattered loads such as a well pump or fence charger, which suit small standalone systems more than a grid-tied array.
What utility rules apply to farm solar near Greer?
On Greer CPW, the farmhouse goes on code 750, which CPW’s rate sheet says covers farm homes, and connects under Tier 1 (20 kW or less, $100).
Farm buildings on a separate non-domestic account with demand under 30 kW go on code 704, which charges $22 a month plus energy starting at 13.85¢ per kWh for the first 3,000 kWh, and connect under Tier 2 (100 kW or less, $250, with $300,000 of general liability insurance).
Both rates credit exports at 6.54¢ on-peak and 4.251¢ off-peak.
CPW says it serves primarily the city limits plus nearby unincorporated areas, so many working farms outside Greer are on Duke Energy Carolinas or an electric cooperative instead, each with its own rules.
Check the CPW service map or your bill before getting designs. For other utilities’ farm terms see solar for farms in South Carolina.
Ground-mount or rooftop on a Greer-area farm?
Ground mounts suit farms because they avoid ageing barn roofs and can face due south, but they take land out of use and need trenching to the meter.
Barn and shed roofs avoid that, if the structure can carry the load.
Either way, CPW’s rule that the AC rating (DC × 0.85) may not exceed 90% of the service rating applies, and a farm on an old single-phase service may need an upgrade.
Permits come from the City of Greer inside city limits and from Greenville or Spartanburg County outside them. Ground or roof mount.
What do farm solar costs and incentives look like near Greer?
We do not publish farm solar prices. Fixed costs on CPW are the $100 or $250 application fee and the City or county permit.
The economics follow the same rule as homes: on-site use at 13.85¢ (the first code 704 block) is worth about twice an export. Size to the load you run in daylight. Solar cost in Greer shows the method.
A farm owner who owns the system may claim South Carolina’s 25% credit, up to $3,500 a year; farm businesses may also look at the Clean Energy Credit on Form TC-54 and federal §48E within its construction deadlines.
USDA Rural Development’s Rural Energy for America Program has funded farm solar in the past, but we could not confirm its current application status at the source on 5 October 2026; ask USDA Rural Development’s South Carolina office before counting on it. Full list on solar incentives in Greer.
Do farms near Greer need batteries, and what upkeep is involved?
A battery earns little on CPW’s flat energy pricing, but it can protect greenhouse fans, cold storage or a well pump through an outage; Greenville County averaged about 12 thunderstorm and high-wind events a year from 2015 to 2025 in NOAA records.
Maintenance on a farm array is mostly keeping vegetation and dust off ground mounts and checking monitoring. Read battery storage in Greer and commercial solar in Greer for the business-rate detail.
Questions to ask before farm solar near Greer
Farmhouse and barns may be on different accounts, or different utilities.
Code 750 for the farm home; code 704 if the farm account’s demand is under 30 kW.
Size to that load, not to the barn roof.
City of Greer inside city limits; Greenville or Spartanburg County outside.
Confirm any USDA program at the source before it goes into the numbers.
Back to solar in Greer.
Questions
Is farm solar common around Greer, SC?
Can a farmhouse on Greer CPW use the residential solar rate?
What rate applies to farm buildings on Greer CPW?
What crops are grown near Greer?
Is USDA REAP funding available for farm solar near Greer?
Written and audited by
HyreSolar Research
Primary-source research, data analysis and fact checking
We are a research desk, not a sales floor. We read the statute, the tariff, the code section, the federal filing or the manufacturer data sheet ourselves, and we publish the figure with the document it came from and the date we retrieved it.
Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify. That rule has cost us whole sections, and it is why the rest can be checked.
- 160
- primary sources read and cited
- 228
- figures with a retrieval date
- 115
- federal and state government sources
- 66
- researched pages published
How this desk works
- Primary sources only. Statutes from the legislature’s own publishing system, federal data from the agency that collects it, code text from the adopted edition, manufacturer claims from the data sheet. We do not cite an article that cites a source; we go and read the source.
- Every figure carries its provenance. A named document and the date we retrieved it, so you can check it and so you know how old it is. Retrieval dates are not decoration: an EIA rate from May is a different fact from an EIA rate from August.
- We publish what we could not verify. Every research page carries a section naming the things we tried to establish and could not, and why. A paywalled standard, a state website that refused the request, a manufacturer that publishes no figure at all.
- We separate measurement from modeling from our own reasoning, and label which is which on the page. A laboratory measurement, an assumption inside a modeling tool and our own inference are three different kinds of claim and they are never presented as one.
- We do not sell solar, and we take no payment for placement, ranking or a favorable mention. Nobody buys a position on this site.
Data as of Last verified 5 October 2026. Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold. Our editorial policy sets out how we source, date and correct what we publish.