HyreSolar

North Charleston

Solar Installers in North Charleston, SC

How to compare proposals and check licences. No rankings.

Updated October 5, 2026 · Last verified 5 October 2026

Get Solar Options Questions

Get Solar Options

If you have done your research and want to speak with a solar professional, HyreSolar can help you explore available options.

Your details
3 business days to cancel a door sale SC Code §37-2-502
$2,500 ORS fine per violation SC Code §58-27-2660
2 utilities with different export rules Dominion / Berkeley Electric

Which licence covers each part of a North Charleston solar job

Part of the jobLicence that covers it (SC LLR)
Panels and related components"Solar Panel Installer" is a Residential Specialty registration with the Residential Builders Commission (SC LLR): fabricating, assembling, installing and replacing panels and related components.
Roof attachmentsRoof mounting: a Residential Builder, a Residential Specialty Contractor with the Roofer classification, or a General Contractor with a roofing classification.
Wiring and connectionWiring and connection: a Residential Builder, a licensed residential electrician, or a mechanical contractor with the electrical classification.
Structural roof upgradesStructural roof upgrades: a Residential Builder, a Residential Specialty Contractor with the Carpenter classification, or a General Contractor with building or structural framing.

SC LLR Residential Specialty Contractor registration package, retrieved 5 October 2026. The City of North Charleston asks for a copy of the contractor’s state licence with the permit application.

Look each licence up on SC LLR before you sign. How to verify a licence.

What kinds of installer work in North Charleston

You will meet three kinds. Local installers with their own crews, who design, permit and install. National or regional sales companies that sell the job and subcontract the install, sometimes to crews based outside the Lowcountry.

And electricians or roofers who add solar to their trade. None is better by type; what matters is who holds the workmanship warranty, who pulls the City permit and who comes back after a storm. Who actually installs your solar.

How a North Charleston installer should size and price your system

A sound proposal starts from your twelve months of bills and states which tariff it assumes.

On Dominion that is Rate 5 with the Solar Choice rider, where surplus banks within each price period and the November balance is paid at avoided cost, so an oversized array earns little for its last panels.

On Berkeley Electric it is the Renewable Surplus Rider at 6.03¢ per exported kWh, and the co-op caps size at your annual use ÷ 1,800.

Price should be broken into equipment, labour, permitting, roof or electrical work and any financing charge. The City permit is public and a few hundred dollars on a typical contract, so it should appear as a line. Worked examples: solar cost in North Charleston.

Quote-comparison checklist for North Charleston proposals

Utility and tariff named

Dominion Solar Choice on Rate 5, or Berkeley Electric’s Renewable Surplus Rider. Not “net metering” for a new system.

System size in kW DC and AC

Within 20 kW AC, and within Berkeley’s usage cap if it applies.

Equipment list

Panel and inverter make and model, battery if any, with each data sheet.

Cash price and financed price

Both, on one page, so any dealer fee shows.

City permit and utility fees as lines

City building and electrical permits; Berkeley’s $150 application and $50 inspection where relevant.

Roof plan

Is the roof replaced first, and who pays to remove and reinstall panels later?

Warranties in writing

Panel product and output, inverter, battery, and workmanship, with who honours each.

Savings assumptions

Annual production, share used on site, and any utility rate escalator, with sources.

State credit shown honestly

Spread over years at the $3,500 cap or half your liability, not as a first-year rebate.

Put two or three proposals side by side in the proposal analyzer.

Questions to ask a North Charleston installer

Who pulls the City of North Charleston permit, and in whose name?

The licence holder on the permit is who the City holds responsible.

Is my address inside the city limits?

If not, the permit goes to Charleston or Dorchester County.

Is my home in a special flood hazard area?

If so, who orders and pays for the elevation certificate the City may require?

What design wind speed did your engineer use?

Sealed drawings are required; the answer shows the engineer looked at your address.

Who services the system after a storm?

Ask for response terms in writing.

Warranties and equipment on a North Charleston install

Panel product and output warranties come from the manufacturer; the workmanship warranty, which covers roof leaks and wiring faults, comes from the installer and is only as good as the company.

Salt air near the Cooper and Ashley rivers is a reason to ask whether racking and fasteners are rated for corrosive environments. Battery options are covered on battery storage in North Charleston and loans on solar financing in North Charleston.

Red flags in North Charleston solar sales

Claims to represent Dominion or Berkeley Electric

Utilities do not send installers door to door.

A promise of “net metering”

New systems get Solar Choice or the co-op rider, not legacy net metering.

The federal 30% credit in the savings figure

§25D ended for homeowners after 2025.

A PPA offer

Third-party power sales from your roof are not permitted in South Carolina.

Pressure to sign today

until midnight of the third business day after signing, by written notice (SC Code §37-2-502). The Office of Regulatory Staff can fine sellers up to $2,500 per violation.

Return to the North Charleston solar hub, or the statewide guide on choosing a South Carolina installer.

Questions

Who are the best solar installers in North Charleston?
We do not rank installers. Get three written proposals, check each licence on SC LLR, and compare them with the checklist on this page.
What licence does a solar installer need in North Charleston?
Panels fall under the SC LLR Solar Panel Installer registration, but roof attachment and wiring need a builder, roofer, electrician or general contractor classification. The City asks for a copy of the state licence with the permit.
Can I cancel a solar contract signed at my door in North Charleston?
Yes, until midnight of the third business day after signing, by written notice (SC Code §37-2-502).
Should my North Charleston quote mention Dominion or Berkeley Electric?
Yes. The two utilities credit exports differently, so the savings figure depends on which one serves you.
Do North Charleston installers need a City business licence?
Check with the City of North Charleston before work starts; its permit application asks for the contractor’s state licence.
How many quotes should I get in North Charleston?
At least three, each on the same utility tariff and with the cash price shown, so they can be compared line by line.

Written and audited by

HyreSolar Research

Primary-source research, data analysis and fact checking

We are a research desk, not a sales floor. We read the statute, the tariff, the code section, the federal filing or the manufacturer data sheet ourselves, and we publish the figure with the document it came from and the date we retrieved it.

Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify. That rule has cost us whole sections, and it is why the rest can be checked.

160
primary sources read and cited
228
figures with a retrieval date
115
federal and state government sources
66
researched pages published

How this desk works

  • Primary sources only. Statutes from the legislature’s own publishing system, federal data from the agency that collects it, code text from the adopted edition, manufacturer claims from the data sheet. We do not cite an article that cites a source; we go and read the source.
  • Every figure carries its provenance. A named document and the date we retrieved it, so you can check it and so you know how old it is. Retrieval dates are not decoration: an EIA rate from May is a different fact from an EIA rate from August.
  • We publish what we could not verify. Every research page carries a section naming the things we tried to establish and could not, and why. A paywalled standard, a state website that refused the request, a manufacturer that publishes no figure at all.
  • We separate measurement from modeling from our own reasoning, and label which is which on the page. A laboratory measurement, an assumption inside a modeling tool and our own inference are three different kinds of claim and they are never presented as one.
  • We do not sell solar, and we take no payment for placement, ranking or a favorable mention. Nobody buys a position on this site.

Data as of Last verified 5 October 2026. Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold. Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates