HyreSolar

Hiring and verification

How to verify a solar installer’s license in any state

Which license to look for in your state, where to search, how to read the result, and what the bond and insurance lines tell you.

Updated September 2026 · Data as of our verification database (June to August 2026) plus state board pages read on 2 September 2026

Written by HyreSolar Research team Research and analysis

Audited by HyreSolar Research team Data audit and fact check

4 states name solar in the license itself California, Florida, Louisiana, Virginia
12.8% of licenses we checked were not current 1,721 records
272 records the register would not answer at all Not the same as unlicensed

The short answer

Check the state licensing board directly, using the exact legal entity name from your contract, and expect the license not to say "solar". Across the 27 states in our verification database, four name solar in the license itself.

Everywhere else the credential that authorizes residential photovoltaic work is an electrical or general contractor license under a different name, and in several states residential solar requires no state-level license at all. That is why homeowners search a register, find nothing, and reach the wrong conclusion.

A license you cannot find may be a license you are looking for under the wrong name, in the wrong register, or for the wrong entity.

Get solar options, then check the license

Free, with no obligation. A person at HyreSolar reads it and gets back to you. Matching with solar professionals is not live yet.

Why you cannot find the license

The usual advice is "check the contractor’s license". It is correct and it is not enough, because it assumes a thing exists that mostly does not: a solar license.

We checked 2,062 solar companies against state licensing authorities across 27 states, then went back through each state’s own board pages and administrative code to establish what the credential is actually called. Four states name solar in the license itself.

California has a C-46 Solar Contractor classification, scoped to "thermal and photovoltaic solar energy systems". Florida has a statutory Solar Contractor category. Louisiana has S.12 Solar Energy Equipment. Virginia has an Alternative Energy System Contracting specialty. That is the complete list from our set.

Everywhere else we verified, residential photovoltaic work is authorized by an electrical license that says nothing about solar. Arizona is the sharpest case, and it contains a trap.

We read the registrar’s entire classification list: there is no photovoltaic class at all, and every Arizona classification whose title contains the word "Solar" is swimming pool, boiler, plumbing or air conditioning work.

A homeowner searching for a solar class in Arizona will find several, and none of them is the right one.

Washington is the same shape without the trap: we enumerated all sixteen electrical specialties and none is solar.

Then there is the case that catches people out completely. In some states residential solar requires no state-level license.

Ohio’s licensing statute defines a construction project so as to exclude "a residential building as defined in section 3781.06", and that section defines one as "a one-family, two-family, or three-family dwelling house".

State electrical licensing does not reach a house. Illinois goes further: its regulator’s own list of licensed professions contains no general contractor, no electrical contractor, no home improvement contractor and no solar license. Roofing is the only construction trade the state licenses at all.

So a search that returns nothing has at least four possible meanings: wrong entity name, wrong register, right register but the license is under a class you did not think to look for, or a state that does not license this at the state level.

Exactly one of those meanings is "this company is unlicensed", and it is not the one to assume first.

You do not have to take our word for that. Oregon’s Construction Contractors Board says it on its own search page: a failure to find a contractor by name "does not assume they are unlicensed". A state board that runs the register is telling you not to over-read an empty result from it.

The four states that name solar in the license

StateThe classificationWhat its scope actually is
CaliforniaC-46 Solar ContractorScope is "thermal and photovoltaic solar energy systems". C-10 electrical, B general building and C-39 roofing also legitimately appear on solar work.
FloridaSolar ContractorA statutory contractor category covering solar water heating, pool heating and photovoltaic systems.
LouisianaS.12 Solar Energy EquipmentCovers PV and thermal. The holder must also hold a Building, Electrical, Mechanical or Residential classification, and the license is required above a $10,000 job value.
VirginiaAES Alternative Energy System ContractingA specialty covering generation systems from the customer’s meter. It expressly does not include electrical, plumbing, gas fitting or HVAC functions, which sit in other classifications.

Read from each board’s own classification page or the state code, September 2026.

Louisiana’s is the most conditional of the four. The solar classification does not stand alone there: the holder must also carry a building, electrical, mechanical or residential classification.

Where solar rides on an electrical license instead

StateWhat authorizes residential photovoltaic work
ArizonaR-11 residential electrical, or CR-11 for both scopes. There is no solar PV classification at all. Every Arizona class whose title contains the word "Solar" is thermal, pool or plumbing work.
WashingtonAn electrical contractor license. No solar specialty exists: the sixteen electrical specialties run from general and residential through pumps, signs and telecommunications, and none of them is solar.
TexasAn electrical contractor license. Texas separately registers the seller under a solar-specific scheme, which is not the same thing as licensing the installation.
WisconsinA licensed Electrical Contractor credential. The license number must appear on all construction bids and contracts, and work may not start before a permit issues.
North CarolinaAn electrical contractor license, in one of three value-limited classes or a special restricted residential classification.
MinnesotaTwo separate credentials: a residential building contractor registration and an electrical contractor license.
MarylandA Home Improvement Commission license to contract with a homeowner. Subcontractors working under a licensed contractor have not needed their own since July 2016.

Verified against each state’s board pages or administrative code, September 2026.

Arizona is the one to be careful in. Searching its register for a solar classification returns several, all of them pool, boiler or plumbing work, and none of them the classification that covers photovoltaic installation.

States where there may be no state license to find

StateThe position, and how firmly we established it
OhioVerified. Verified, and the mechanism is explicit. The licensing statute defines a "construction project" so as to exclude "a residential building as defined in section 3781.06", and that section defines a residential building as "a one-family, two-family, or three-family dwelling house". State electrical licensing simply does not reach a house. Your local building department does.
IllinoisVerified. Verified from the state regulator’s own list of regulated professions. There is no general contractor license, no electrical contractor license, no home improvement contractor license and no solar license. Roofing is the only construction trade the state licenses. Electrical licensing is municipal.
New YorkNot established. Widely described as having no statewide contractor license, and home improvement licensing there is certainly county and city level. We could not read a primary source proving the absence, so we do not assert it.
MissouriNot established. Same position. Licensing appears to be municipal, but the state’s board list would not render to us and we will not publish an unproven negative.
NevadaNot established. The board licenses contractors and describes 42 subclassifications under one heading, but does not list them on its own page, and the administrative code that does was unreachable. We cannot say whether a photovoltaic subclass exists.
UtahNot established. Commonly described as having a solar PV contractor class. Every primary source we tried refused automated retrieval, so we are not asserting it either way.
Hawaii, Massachusetts, Pennsylvania, New Jersey, Connecticut, New Mexico, Michigan, ColoradoNot established. Boards and public search tools confirmed to exist. Specific classifications, and in several cases bond and insurance amounts, could not be read from a primary source.

The second group is deliberately unresolved rather than omitted. Each was attempted and each source refused automated retrieval.

An unverified negative is the most damaging thing a page like this can publish, because it reads as an accusation about every company in the state. Where we could not prove the absence of a licensing regime, we say so instead of implying it.

What we found doing this two thousand times

Share of verified company records where the register would not answer272 of 1,806 records: register unreachable, not license missingHyreSolar contractor verification database, 27 states
272 of 1,806 verified records could not be checked against a register at all. These are not companies without licenses. They are registers that would not answer. HyreSolar contractor verification database, 27 states, June to August 2026.

Our database holds 2,062 solar company records, of which 1,806 were verified against a state authority. The useful figures are about how the registers behave, not about any company.

Of the 1,721 records where a register actually returned an answer, 1,401 showed a current primary license, 57 were confirmed only through a secondary source such as a program roster, 193 showed an expired license and 27 a revoked one. That is 12.8% not current, roughly one in eight.

That number is a statistic about the companies we chose to research, on the dates we checked them. It is not a market rate and must not be read as one.

A license can lapse for a renewal fee as easily as for a disciplinary reason, and a company with a lapsed license in August may be current in September. What it establishes is narrower and still worth knowing: checking is not a formality that always comes back clean.

The second figure matters more for how you read your own search. 272 records came back unable to verify, meaning the register could not be queried rather than that a license was missing.

Georgia alone accounts for 62 of them, and we went back to find out why. Georgia does license both residential and general contractors and electrical contractors, under published rules.

The problem was ours: the state runs more than one verification tool, and the one we could reach turns out to cover only cemeteries, charities and securities. It contains no contractors at all, which produces exactly the near-total miss we recorded.

The construction boards live in a separate system that refuses automated access.

Reporting those 62 as unlicensed would have defamed real businesses over a wrong URL, and it is the same mistake available to any homeowner who searches the wrong register and draws a conclusion.

Three distinctions worth more than the whole rest of this page

Unverifiable is not unlicensed. A register that will not answer has told you nothing about the company. It has told you something about the register.

Confirmed elsewhere is not confirmed by the issuer. A company appearing on a program roster or an industry list is weaker evidence than the license appearing in the register that issued it. Both are worth having; they are not the same thing.

A snapshot is not a compliance finding. What a register says today is what it says today. It is evidence about a moment, and the honest way to use it is as a prompt to ask a question, not as a conclusion to act on alone.

How to check, in about five minutes

1
Get the exact legal entity name

From the contract or proposal, not the truck or the website. Include Inc., LLC and any state suffix. Brands and legal entities can be different things in this industry, and a search for the brand may find nothing while a search for the entity finds an active license immediately.

2
Find your state’s actual licensing authority

It has a different name in every state: a registrar of contractors, a board of examiners of electrical contractors, a department of labor and industry, a department of consumer protection. Search for your state plus "contractor license search". Use the .gov result, never a directory that offers to check for you.

3
Search by license number first, then by name

If the contract states a license number, search that. It is unambiguous, and confirming that the number belongs to the entity on your contract is the single most valuable thirty seconds of this process. If there is no number on the contract, that is worth asking about before anything else.

4
Check the classification, not just that something exists

A license in a classification that does not authorize photovoltaic work is not the license you need. If your state has a solar class, look for it. If it does not, find out which electrical or general classification covers PV, and ask the board if the register does not make it obvious.

5
Check the status and the expiry date together

Active with an expiry date next month is a different fact from active with two years to run, particularly on a job that has not started. Note both.

6
Check bond and insurance if the register shows them

Many registers publish bond status and workers’ compensation coverage alongside the license. Where they do, it is the same search and it tells you what happens if someone is injured on your roof.

7
Check the salesperson separately if your state registers them

A handful of states register the person who sells as well as the company that installs, and those are separate searches in separate registers. We cover which states, and where to search, on our state sales regulation page.

8
Screenshot the result with the date visible

You are creating a record of what the register said on the day you signed. That costs nothing and is occasionally worth a great deal.

How to read what the register tells you

What you seeWhat it meansWhat to do
Active, right class, right entityThe check passed. This is the outcome you are looking for.Note the expiry date and move on to the contract itself.
Active, but a different entity from your contractCommon and not necessarily wrong. The installing entity can be a subsidiary or subcontractor.Ask in writing which entity is contracting and which is installing, and check the one that will do the work.
Active, but the classification does not cover PVA license for other work is not a license for this work.Ask which classification authorizes photovoltaic work in your state, and who on the job holds it.
ExpiredA fact about a date, which may be a renewal oversight or something more.Ask directly and ask for the renewal. Do not sign, and do not assume the worst either.
Revoked or suspendedThe board has acted. This is materially different from expired.Stop and ask the board what the action was. Most publish disciplinary history.
Nothing foundAmbiguous, and the most misread result of all. Wrong name, wrong register, wrong class, or a state that does not license this.Try the entity name variants, then check whether your state licenses residential solar at the state level at all. Ask the company for the number before concluding anything.
A qualifier or responsible officer namedThe license exists because a specific individual stands behind it.Nothing to do today, but see below on why that makes a license more fragile than it looks.

Analysis by HyreSolar, based on the register behaviors observed across our verification work.

The bottom two rows are the ones people get wrong. An empty result is not a finding, and a named qualifier is not decoration.

Where to actually check, and what each tool will accept

StateThe public tool
CaliforniaCSLB, Check a License
FloridaDBPR Online Services licensee search
TexasTDLR License Search, which covers electricians and solar retailers and salespeople in one tool
ArizonaRegistrar of Contractors contractor search
LouisianaLSLBC contractor search, which also searches by qualifying party
VirginiaDPOR License Lookup
WashingtonL&I Verify a Contractor, Tradesperson or Business
MinnesotaDLI license and registration lookup, searchable as a guest, with nightly downloadable rosters
OregonCCB contractor search
NevadaState Contractors Board license search
MarylandMHIC licensee search
New JerseyDivision of Consumer Affairs license verification, using Business Search for contractor businesses
ConnecticutCT eLicense, which the state describes as primary source verification
IllinoisIDFPR License Lookup, for the professions the state does license
OhioOhio eLicense

Each tool was identified from the board’s own site navigation rather than from a directory. Search directly on the board’s domain rather than through any service offering to check for you.

Search fields differ more than you would expect. Nevada’s form accepts only a license number, company name or principal’s name, with no city or trade filter. Minnesota’s guest search wants the complete license number. Texas returns active licenses only, so an expired one may simply not appear.

Bond and insurance, which the same search can show you

Many registers publish bond and insurance status alongside the license, and it is the same thirty seconds of work. It is worth understanding what those numbers are, because they are frequently smaller than the job.

A contractor’s bond is not insurance for you. It is a fixed sum a surety will pay out on valid claims, shared among everyone who claims against it, and it can be a fraction of what a bad installation costs. California requires a $25,000 contractor’s bond.

Washington’s electrical contractor bond is $4,000. Oregon scales its by license type, from $15,000 for a residential limited contractor to $80,000 for a commercial general contractor at the higher level, with liability insurance requirements alongside from $100,000 per occurrence up to $2 million aggregate.

Nevada does not publish a formula at all: its board sets each bond between $1,000 and $500,000 case by case, weighing the license type, the monetary limit and the applicant’s financial responsibility and character.

A few states run something better than a bond. Maryland requires home improvement contractors to carry a minimum of $500,000 in general liability insurance, and operates a Guaranty Fund that compensates homeowners for losses from poor workmanship or contract failure, funded by a small assessment on each license.

That fund caps at $30,000 per claim, which tells you something useful about the scale of loss these schemes are built for.

The practical reading: check that a bond exists, note its size against the price of your job, and do not mistake it for cover. If your state runs a recovery or guaranty fund, find out its per-claim cap before you need it.

An active license is a statement about a person, not only a company

Corporations cannot sit an exam. So states attach a company’s license to a named individual, variously called a qualifying individual, qualifying party, qualifying agent, responsible managing officer or responsible managing employee, who is legally required to supervise the construction work.

This makes a license more fragile than the word "active" suggests. In California, if that person leaves, the company must notify the board within 90 days and replace them within 90 days, and failure to notify results in automatic suspension of the license or removal of the classification.

Florida allows 60 days and bars the business from taking on new work during the gap.

You cannot check for this in advance, and we are not suggesting you try.

The reason to know it is interpretive: a license that is active today is active because of arrangements that can change without anything visible happening to the company.

It is a reason to check close to signing rather than months beforehand, and a reason not to treat a check done once as permanent.

What happens if the license is not current

First, ask. An expired license is frequently a renewal that got away from a small business, and the company will either produce the current one or not. Both answers are informative and you get one for free.

Second, understand that in some states this is not merely a compliance question, it is a question about whether the contract can be enforced against you. California is the clearest example.

Its Business and Professions Code provides that a contractor cannot bring an action for the collection of compensation without alleging they were duly licensed at all times during performance.

And it goes further in the homeowner’s direction: a person who uses the services of an unlicensed contractor "may bring an action in any court of competent jurisdiction in this state to recover all compensation paid to the unlicensed contractor".

That is an unusually strong remedy and it is specific to states that have enacted something like it.

We are not telling you it exists where you live, and we are certainly not suggesting anyone hire an unlicensed contractor in the hope of using it. The point is narrower: licensing is not paperwork.

In some states it determines whether the other party can enforce the agreement at all.

Third, if something has already gone wrong, the licensing board is a real avenue in a way that a review site is not.

Boards take complaints, publish disciplinary history, and in some states administer recovery funds for consumers harmed by licensees.

Find out which body covers your installer at the time you sign, not at the time you are in dispute.

Method and limitations

How the database was built

2,062 solar company records were checked against state licensing authorities in 27 states between June and August 2026, of which 1,806 were verified.

Each record stores the issuing authority, the license class, the source URL, the retrieval date and a reproducible query, so any figure on this page can be traced to the check that produced it.

The classification findings were then re-established independently in September 2026 by reading each state’s own board pages, administrative code or statute, rather than by relying on our own stored notes.

That second pass is what produced the four-state figure, the Arizona classification trap and the Ohio and Illinois findings, and it is also what corrected an earlier draft of this page that named only one state.

Rates on this page use 1,721 as the denominator: the records where a register actually answered. Records that could not be checked are excluded from every rate rather than counted as failures, which is the difference between a statistic and an accusation.

What is deliberately not published

No per-company license status appears anywhere on this site. Our records name specific businesses and license numbers.

None of that is reproduced here, and the state regime table above was written from the general findings with every company identifier stripped out.

A register snapshot on one date is not a compliance finding about a business, and publishing it as though it were would be both unfair and wrong.

We also do not publish a ranking of states by license compliance. The per-state rates vary enormously, but so do the sample sizes and the ease of querying each register, and a ranking would mostly measure how cooperative the websites are.

Coverage and its limits

27 states are covered, not fifty. The state regime table describes those where we established the position clearly enough to state it in general terms. If your state is absent, this page does not know the answer for it, and the licensing board itself is the right place to ask which classification authorizes photovoltaic work.

The figures are a snapshot of the period we checked. Licenses lapse and are renewed continuously, so the specific counts will drift even though the shape of the finding will not.

Not legal advice

The consequences of contracting with an unlicensed contractor vary sharply between states, and the remedy described above is specific to the state whose statute we quote. Where real money is involved, ask your state’s licensing board or a consumer attorney rather than relying on a general description.

Questions

Do solar installers need a special solar license?
Almost never. Across the 27 states in our database, one has a solar-named classification and one more has a solar class alongside several others that also qualify. Everywhere else the credential is an electrical or general contractor license, and in several states residential solar needs no state-level license at all. Looking for the word "solar" in a register is the most common reason a valid license appears to be missing.
How do I check a solar installer’s license?
Take the exact legal entity name from the contract, find your state’s licensing authority on its own .gov site, and search by license number if the contract gives one or by entity name if not. Then check three things rather than one: that the license is active, that its classification authorizes photovoltaic work, and that it belongs to the entity that will actually perform your installation.
What if I cannot find the company in the register?
Do not conclude they are unlicensed. Try name variants including the full legal entity name with its suffix, check whether you are in the right register for the trade, and check whether your state licenses residential solar at the state level at all, because several do not. Then ask the company for its license number directly. In our own work, 272 of 1,806 verified records came back unverifiable because a register would not answer, not because a license was missing.
Is an expired license a dealbreaker?
It is a reason to ask, not automatically a reason to walk. Licenses lapse over renewal fees as well as for serious reasons, and many lapses are cured quickly. Ask directly, ask for the current license, and do not sign until it resolves. A revoked or suspended license is a different matter, because a board has taken action, and most boards publish what the action was.
How often are solar licenses not current?
Of the 1,721 records where a register answered us, 12.8% showed a license that was expired or revoked at the moment we checked. That is a statistic about the companies we chose to research on the dates we checked, not a market rate for the industry, and a lapsed license is not evidence of anything more than a lapsed license. It is still a reason to check rather than assume.
Should I check the license of the brand or the installer?
The entity that will contract with you and perform the work, which may be neither the brand nor the entity whose logo is on the proposal. Licenses attach to the legal entity that signs, so a national brand typically operates through separately licensed entities or subcontractors. Establish which entity is yours first, then check that one.
Does a license tell me the work will be good?
No, and it is worth being clear about that. A license is a floor, not a rating. It tells you the entity met the state’s entry requirements and has not had them withdrawn. Workmanship, solvency and how a company behaves when something goes wrong are separate questions with separate evidence.
What can a licensing board actually do for me?
More than a review site. Boards take complaints against licensees, publish disciplinary history, and in some states administer recovery funds for consumers harmed by a licensed contractor. The practical advice is to find out which body covers your installer when you sign rather than when you are in dispute.

Written and audited by

HyreSolar Research

Primary-source research, data analysis and fact checking

We are a research desk, not a sales floor. We read the statute, the tariff, the code section, the federal filing or the manufacturer data sheet ourselves, and we publish the figure with the document it came from and the date we retrieved it.

Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify. That rule has cost us whole sections, and it is why the rest can be checked.

160
primary sources read and cited
228
figures with a retrieval date
115
federal and state government sources
66
researched pages published

How this desk works

  • Primary sources only. Statutes from the legislature’s own publishing system, federal data from the agency that collects it, code text from the adopted edition, manufacturer claims from the data sheet. We do not cite an article that cites a source; we go and read the source.
  • Every figure carries its provenance. A named document and the date we retrieved it, so you can check it and so you know how old it is. Retrieval dates are not decoration: an EIA rate from May is a different fact from an EIA rate from August.
  • We publish what we could not verify. Every research page carries a section naming the things we tried to establish and could not, and why. A paywalled standard, a state website that refused the request, a manufacturer that publishes no figure at all.
  • We separate measurement from modeling from our own reasoning, and label which is which on the page. A laboratory measurement, an assumption inside a modeling tool and our own inference are three different kinds of claim and they are never presented as one.
  • We do not sell solar, and we take no payment for placement, ranking or a favorable mention. Nobody buys a position on this site.

Data as of our verification database (June to August 2026) plus state board pages read on 2 September 2026. Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold.

Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

HyreSolar contractor verification database, 2,062 solar company records checked against state licensing authorities in 27 states. Each record stores the issuing authority, license class, source URL, retrieval date and a reproducible query. Retrieved June to August 2026.
California Business and Professions Code § 7031, Source for the rule that an unlicensed contractor may not bring an action for the collection of compensation, and for the homeowner’s right to recover all compensation paid to an unlicensed contractor. Retrieved 2 September 2026.
CSLB: Change in Personnel (Responsible Managing Officer and Employee), Source for the 90-day notification requirement, the 90-day replacement window, and automatic suspension of the license or removal of the classification on failure to notify. Retrieved 2 September 2026.
Florida Statutes § 489.119, Business organizations; qualifying agents, Source for the 60-day window to replace a qualifying agent and the bar on new work during the gap. Retrieved 2 September 2026.
Arizona Revised Statutes § 32-1151, Source for the rule that a contractor license must be held in the name of the entity that contracts, which is why the entity name on your contract is the name to search. Retrieved 2 September 2026.
CSLB: Solar Smart, Source for the California license classifications that may perform solar work, and for the guidance that the contract should specify who pulls the required permits. Retrieved 2 September 2026.
California Solar Consumer Protection Guide (CPUC), 2022 edition, Source for the regulator’s own instruction that homeowners check both the provider’s and the installer’s license numbers, and the salesperson’s registration where applicable. Retrieved 2 September 2026.

Checked the license and ready to compare?

Run the five-minute check on every company whose proposal you receive, using the legal name on the contract. When you are ready to compare proposals, Get Solar Options connects you with solar professionals serving your area. Nothing is shared until you agree.

Get Solar Options Analyze a proposal

HyreSolar is an independent analysis and matching service. We are not an installer, lender or utility. When a reader asks to be introduced, installers may pay us a referral fee. That fee never buys ranking, scores or placement in research. Our editorial policy sets out the rules.