New construction solar

Adding solar while a house is being built: who installs it, what code may require, and what to pre-wire.

Updated September 3, 2026

Get Solar Quotes What solar costs

Written by HyreSolar Research Desk Primary-source research and fact checking

The short answer

Solar on a new home is cheapest to plan before the roof goes on: conduit, panel capacity and roof layout can be designed in.

In California the building energy code expands solar and battery requirements, with the 2022 code applying to permit applications from 1 January 2023.

Elsewhere it is optional, and you can use the builder’s package or your own installer.

Building with solar in mind

Design in, not bolt on

Roof orientation and conduit runs cost little now.

California requires it

Its energy code sets solar and storage standards for new homes.

Builder packages vary

Check equipment, size and who warrants it.

Builder package or your own installer?

A builder package is convenient and permitted with the house. It may be sized only to meet code, not your usage. Using your own installer gives you choice but needs coordination with the builder’s schedule and warranty.

Ask whether the builder system is owned or leased, a question that also applies to resales: see pre-purchase inspection.

What to pre-wire

Even without solar on day one, ask for these.

Conduit from roof to panel

, so wiring needs no wall opening later.

Main panel capacity

for solar, battery and EV charging.

A battery location

that meets the residential code’s storage rules.

A 240-volt circuit

for an EV charger.

Adding solar to a new build

01
Decide early

Before roof framing and electrical rough-in.

02
Size to usage

Not only to code minimum.

03
Coordinate trades

Roofer, electrician, solar installer.

04
Permit with the house

Or as a separate solar permit.

05
Install after roofing

Mounts flashed into the new roof.

06
PTO at move-in

Utility approval before switch-on.

What changes a new-build solar price

New construction removes some costs and adds coordination.

FactorEffect on a new Construction Solar quote
Builder markupPackages can be priced into the mortgage.
System sizeCode minimum versus your usage.
BatteryMay be required or optional.
Panel capacityCheaper to size up during the build.
Own installer coordinationScheduling and warranty overlap.

See solar installation costs and battery costs.

Questions for your builder

Is the solar owned by me at closing, or leased?
What size, and is it sized for my usage or code minimum?
Who warrants the system and the roof penetrations?
Will you run conduit and size the panel for battery and EV?
Can I use my own installer?

Your inquiry

Tell us about your home

Nothing goes to a solar professional unless you agree.

Free, with no obligation: a person reads it and gets back to you. Matching is not live yet, so this is not a quote.

Get Solar Options

If you have done your research and want to speak with a solar professional, HyreSolar can help you explore available options.

Your details

Questions

Is solar required on new homes?
In California the energy code sets solar standards for new homes; the 2022 code expanded solar and storage requirements. Most other states do not mandate it.
Is it cheaper to add solar during construction?
Usually, because wiring, panel capacity and roof layout can be designed in, avoiding retrofit work.
Can I add a battery later?
Yes, more easily if the builder left space and panel capacity for one.

Written and audited by

HyreSolar Research

Primary-source research, data analysis and fact checking

We are a research desk, not a sales floor. We read the statute, the tariff, the code section, the federal filing or the manufacturer data sheet ourselves, and we publish the figure with the document it came from and the date we retrieved it.

Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify. That rule has cost us whole sections, and it is why the rest can be checked.

160
primary sources read and cited
228
figures with a retrieval date
115
federal and state government sources
66
researched pages published

Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold. Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

California Energy Commission, 2022 Building Energy Efficiency Standards, Source for the 2022 Energy Code expanding solar PV and battery storage standards, applying to permit applications on or after 1 January 2023. Retrieved 22 October 2026.
2024 International Residential Code, section R330, Energy Storage Systems, Source for the one kilowatt-hour threshold, the permitted installation locations, and the spacing and clearance rules. Retrieved 3 September 2026.

This page on new Construction Solar is general and varies by location, utility tariff, building code, roof and your own circumstances. It is not tax, legal or engineering advice. HyreSolar is an independent information site: we do not install, finance, service or inspect solar systems, and we do not supervise or warrant anyone who does.