Awaiting expert review. This page covers rules that vary by utility and jurisdiction. It is kept out of search results until a qualified reviewer has checked it; the sources below are dated so you can verify each point.
Quick answer
Solar Export is the electricity a home solar system sends out to the utility grid because the house is not using all of it at that moment; it is measured by a two-way meter as energy “received” by the utility.
Export is not the same as production. Your panels make power first for your own lights and appliances. Only the part left over leaves through the meter, and only that part counts as an export.
Quick facts
The key facts about solar export, with sources:
- Formula
- Export = solar produced − power used in the home at that moment
- Unit
- Kilowatt-hours (kWh)
- Netting interval examples
- Instantaneous (Georgia Power RNR-Instantaneous Netting); hourly (Santee Cooper DG-25) 24
- Real-world share
- Duke Energy Kentucky net metering homes sent back 4.35 million kWh while drawing 10.89 million kWh (Sep 2024–Aug 2025) 3
- Zero export option
- Georgia Power “Energy Offset Only”: no export allowed, none paid 1
Key takeaways
- An export is only the surplus. Power your home uses at the same moment never leaves the house.
- A two-way meter counts imports and exports on separate channels. Bills often call them “delivered” and “received”.
- How long the meter waits before netting, from instant to hourly to monthly, changes how many kWh count as exports.
- Your monitoring app shows production. Your bill shows exports. The two numbers will never match.
- Some systems are set to export nothing or only up to a cap, using certified controls or relays.
- Rules differ by utility and state. Check your own tariff before you size a system around exports.
What counts as an export
Picture a sunny noon. Your panels make 5 kW. Your fridge, router and air conditioner use 2 kW. The house takes the 2 kW first. The other 3 kW has nowhere to go inside, so it flows out through the meter. That 3 kW, kept up for an hour, is 3 kWh of export.
Once outside, the power feeds your neighbours on the same local line. DOE describes this as surplus from distributed solar serving nearby load 9. The utility does not store it for you. It sells it on and records what you sent.
What the utility pays for that kWh is a separate question, covered on our export compensation page. This page is about the kWh itself: how it is made, measured, shown and limited.
Sources: [9]
The path of one exported kWh
- Panels make DC power → the inverter turns it into AC
- AC power reaches your electrical panel → home loads take what they need
- Leftover power passes the meter → the “received” channel counts it
- Power flows onto the street line → a neighbour’s home uses it
How the meter counts exports
A normal meter only counts power coming in. A solar home needs a bi-directional meter, one that counts flow both ways. Georgia Power programs a customer’s meter “for bi-directional service” only after the system passes testing and gets permission to operate 1.
The meter keeps two running totals, often called channels or registers. Duke Energy Kentucky’s net metering filings call them “delivered” (from the utility to you) and “received” (from you to the utility) 3. Santee Cooper’s DG-25 rider describes the same two measurements: energy the utility delivers and energy the customer-generator delivers back 2.
Smart meters also store these totals in short time blocks. That is what lets a utility net by the hour, or by the half hour, instead of once a month.
Netting intervals: why the same day can show different exports
| Interval | Example (jurisdiction, authority, tariff) | What it does to your export count |
|---|---|---|
| Instantaneous | Georgia, Georgia Power, RNR-Instantaneous Netting (named in Georgia PSC order of 2 Mar 2021) 4 | Every moment of surplus is an export, even if you import a minute later |
| Hourly | South Carolina, Santee Cooper, Rider DG-25 (version read 8 Oct 2026) 2 | Surplus and use within the same hour cancel out first |
| Within each time-of-use period, monthly | South Carolina, Dominion Energy SC, Solar Choice rider, PSC Order No. 2026-374 6 | kWh in and out cancel within each price period over the month |
| Monthly kWh | Georgia, Georgia Power, RNR-Monthly Netting (capped program) 4 | Only the month’s net surplus counts |
| Annual, with 30-minute data | Virginia, Dominion Energy Virginia, NEM 2.0, SCC Case PUR-2025-00079 (new interconnections from about May 2027) 7 | Netting stays energy-based over the year; 30-minute data is collected for information only |
Example: one afternoon, three ways to count
An illustration with round numbers we chose. In one hour the panels make 4 kWh. The home uses 3 kWh, but not evenly: for 30 minutes it uses less than the panels make, then the oven comes on.
| Time block | Solar made | Home used | Surplus (+) or shortfall (−) |
|---|---|---|---|
| First 30 minutes | 2 kWh | 0.5 kWh | +1.5 kWh |
| Second 30 minutes | 2 kWh | 2.5 kWh | −0.5 kWh |
| Counted instantly | — | — | 1.5 kWh exported and 0.5 kWh imported |
| Counted by the hour | — | — | 1.0 kWh exported, 0 kWh imported |
Same panels, same home, same hour. Instant netting records 50% more export and also bills an import. That is why the netting interval in your tariff matters as much as the export rate. The net billing calculator lets you test your own mix.
Where exports show up on your bill
- Received kWh. The total sent to the utility this billing period. Duke Energy Kentucky shows “delivered” and “received” kWh 3.
- Net kWh. Delivered minus received, if your tariff nets in kWh.
- A credit in dollars. Under Duke Energy Kentucky’s Net Metering II rider, from 1 Jan 2025, exported kWh are turned into dollars at an avoided-cost credit rate 3.
- A carry-forward balance. Santee Cooper carries a monthly net credit under $50 to the next bill and pays $50 or more by check 2.
- A rider line. The name of the solar tariff you are on. Our first bill after solar guide walks through a full bill.
How much do homes actually export?
Real figures are rare, but one utility files them every year. Duke Energy Kentucky reported 1,032 residential net metering customers as of 31 Aug 2025 3. Over September 2024 to August 2025 it delivered 10,889,325 kWh to them and received 4,347,810 kWh back 3.
That works out to roughly 40 kWh received for every 100 kWh delivered, and about 4,200 kWh of export per home for the year (our division of Duke’s totals). It is one Kentucky utility, not a national rule. Your share depends on system size, roof and how much power you use in the daytime.
Sources: [3]
Exporting: what you gain and what you give up
Why exports help
- Surplus that would be wasted earns a credit or a lower bill under most tariffs.
- You can size a system for the whole year instead of the lowest-use day.
- Your power serves nearby homes on the same line, close to where it is made 9.
Why exports can disappoint
- Most new tariffs pay less for an exported kWh than you pay to import one.
- Short netting intervals turn more of your output into low-value exports.
- Busy local lines may limit how much you can send out.
- Exports are the first thing a tariff change hits.
Export limits and zero-export systems
A utility can cap exports or ban them. Georgia Power offers “Energy Offset Only” (EOO): the system “cannot push energy back onto the Electric System” and is not paid for surplus 1.
Georgia Power may require equipment to stop exports, and it puts a system on EOO by default if the customer has not picked a program 1.
How do you stop power flowing out? New Mexico’s interconnection rule lists the accepted methods plainly 5. A reverse-power relay trips if power starts to flow out.
A minimum-import relay trips if imports drop too low. A power control system certified to UL 1741, with a response time of no more than 30 seconds, can hold exports at zero or at a set cap 5.
A system can also simply be small enough, no more than half the home’s verified minimum load 5.
These are New Mexico’s rules, shown as a clear example. Your own utility’s list may differ. In Georgia, a battery that can run in backup mode needs Georgia Power’s DB 18-23 non-export form 1.
What exports do to cost and value
We do not give system prices here; see our solar cost guide. What exports change is the value side.
Every kWh you export instead of using yourself is worth the export credit, not the retail price you avoid. The bigger the gap between those two, the more a high export share drags on payback. A battery or moving loads into sunny hours can shift kWh from export to self-use.
Export controls add hardware and design work. A certified power control system or relay is part of the quote, not an extra you can skip if your utility requires it. Ask the installer to list it as its own line.
How you get set up to export
The usual order, based on Georgia Power’s published residential process 1. Your utility’s steps may differ.
- Choose an export program or a no-export option with your installer.
- The installer applies to the utility with diagrams and equipment specs. Inverters must show UL 1741 SB and IEEE 1547-2018 listing for Georgia Power 1.
- The utility reviews the request and may set an export cap for your line.
- You sign the interconnection agreement that names your export terms.
- A licensed installer builds the system, and the local inspector checks it.
- The utility tests the system, reprograms or swaps the meter for two-way service, and grants permission to operate.
Checking your exports over time
- Compare the “received” kWh on each bill with the same month last year. A sharp drop with similar weather can mean a fault.
- If your monitoring app has a consumption meter, compare its export figure with the bill.
- After adding a big load, such as an EV, expect exports to fall. That is normal, not a fault.
- Keep the inverter’s grid settings as the utility approved them. Changing an export cap needs the utility’s say.
Warning signs and when to call a pro
- Your bill shows zero received kWh months after permission to operate. The meter may not be set for two-way service. Call the utility.
- The system exports before approval. Georgia Power says it detects this through reverse energy flow alerts and may disconnect service 1.
- A zero-export system shows exports on the bill. The control or relay may have failed; call the installer.
- The inverter keeps cutting output at midday with high-voltage alarms. Your line may be crowded; ask the utility and installer.
- Any heat, buzzing or burning smell near the meter or inverter. Call a licensed electrician.
Safety rule
Never change inverter export settings or bypass a relay yourself. Exports during a grid outage can injure line workers, so only a licensed installer changes these settings, with utility approval.
Who sets export rules
Technical rules (national). IEEE 1547-2018 sets how inverters connect and respond to grid voltage and frequency 8. It is why an inverter may cut back exports when line voltage runs high.
Metering and netting rules (state or utility). These come from tariffs approved by a state commission or, for public power, the utility’s board.
Examples: Georgia Power’s RNR tariffs, under the Georgia PSC (order of 2 Mar 2021 in Dockets 4822 and 16573) 4; Santee Cooper’s DG-25, set by its board 2; and Dominion Energy Virginia’s NEM 2.0, approved by the Virginia SCC in Case PUR-2025-00079 (Order on Clarification 20 May 2026) 7.
Export-limiting rules (state). Some states write the accepted control methods into rule, such as New Mexico in 17.9.568.12 NMAC 5. Others leave it to each utility’s manual.
No national rule says how exports are netted or paid. Always read your own utility’s tariff.
Solar export vs related terms
| Term | What it measures | How it differs |
|---|---|---|
| Solar export | kWh leaving the home through the meter | — |
| Solar production | All kWh the panels make | Includes power used in the home; always larger than exports |
| Self-consumption | Solar kWh used in the home | Production minus exports |
| Export compensation | The money or credit per exported kWh | The price, not the quantity |
| Net metering | A way of crediting exports against imports | A billing rule that uses export counts |
Common misconceptions
- Myth My app’s production number is what I exported.
- Reality Production includes everything your home used first. Only the leftover is exported.
- Myth The grid stores my exports for me.
- Reality Exports are used right away by nearby homes 9. Any “bank” is a billing record, not stored power.
- Myth Every utility counts exports the same way.
- Reality Netting runs from instant (Georgia Power RNR-Instantaneous) to hourly (Santee Cooper DG-25) to yearly (Virginia).
- Myth A zero-export system needs no utility approval.
- Reality Georgia Power still requires an application and an Energy Offset Only agreement 1.
Exports in South Carolina, Georgia and Virginia
South Carolina: Santee Cooper nets by the hour under Rider DG-25 2; Dominion Energy SC nets within each time-of-use period each month under its Solar Choice rider (PSC Order No. 2026-374) 6.
Georgia: Georgia Power home systems export under RNR or are set to Energy Offset Only 1. Virginia: Dominion Energy Virginia’s NEM 2.0 keeps annual energy-based netting and collects 30-minute data for information only, for new non-low-income interconnections from about May 2027 7.
When exports matter to you
- Your utility pays far less for exports than retail. Size the system closer to your daytime use, or plan a battery.
- Your tariff nets instantly or hourly. Expect more exports than a monthly-netting neighbour with the same panels.
- Your utility offers no paid export, or your line is full. Ask about a zero-export or capped design.
- You want to check a quote. Ask the installer what share of output they assumed would be exported, and why.
- Next step: compare installers through Get Solar Options.
Questions about solar export
What does solar export mean?
Solar export is the power your panels send to the grid when your home is not using it all. The house uses its own solar first. Only the leftover passes through the meter, where a separate “received” channel counts it. Neighbours on the same line then use that power.
How do I know how much solar I am exporting?
Look for “received” kWh on your bill, or the export figure in your utility’s online usage data. Your solar app usually shows production, which is higher because it includes power your home used. A monitoring system with a consumption meter can show exports directly.
Why is my export number lower than my solar production?
Because your home uses part of the solar first. Export is production minus what the house used at that same moment. A home that runs air conditioning, a pool pump or an EV charger at midday will export much less than one that sits empty all day.
What is a bi-directional meter?
It is a meter that counts power flowing both ways and keeps separate totals for each. Utilities often call them delivered and received. Georgia Power, for example, programs the meter for bi-directional service once a system passes testing and gets permission to operate.
What is zero export solar?
A zero-export system is set so it never sends power to the grid. It uses a relay or a certified power control system to hold exports at zero. Georgia Power calls this Energy Offset Only. It still needs utility approval, and it earns nothing for surplus.
Can my utility limit how much solar I export?
Yes. A utility can cap exports where a local line is crowded, or offer a no-export option. Control methods include relays and power control systems certified to UL 1741, as listed in New Mexico’s rule. Ask your utility what cap, if any, applies to your address.
Does exported solar power go to my neighbours?
In practice, yes. Electricity flows to the nearest load, so your surplus is used by homes on the same local line. The utility records what you sent and credits or pays you under your tariff. Nothing is physically stored for you.
What does netting interval mean for exports?
It is the time window over which your imports and exports cancel out before anything counts as an export. Instant netting counts every moment of surplus. Hourly netting lets use in the same hour cancel surplus first. Monthly or yearly netting cancels even more.
Do I export solar during a power outage?
No. A grid-tied system must stop sending power when the grid goes down, to protect line workers. Without a battery and the right switch gear, the whole system shuts off. With a battery, it can power your home while staying cut off from the grid.
Will a battery stop my solar exports?
It can reduce them. A battery charges from surplus solar that would otherwise be exported, then covers evening use. Once it is full, extra solar is exported again unless the system is set to zero export. Some utilities have their own rules for battery exports, so check before you buy.
Sources
- Georgia Power, Behind-the-Meter Interconnection Summary for Residential Customers (rev. 15 Aug 2025), retrieved .
- Santee Cooper, Distributed Generation Rider DG-25, retrieved .
- Duke Energy Kentucky, Rider NM Annual Informational Report to the Kentucky PSC (31 Oct 2025, Case Nos. 2002-00240 and 2004-00393), retrieved .
- Georgia Public Service Commission, Order in Docket Nos. 4822, 16573 and 19279 (Administrative Session 2 Mar 2021), retrieved .
- New Mexico Administrative Code 17.9.568.12, Determination of export capacity status (LII), retrieved .
- Dominion Energy South Carolina, Residential Solar Choice rider (PSC Order No. 2026-374), retrieved .
- Virginia SCC, Order on Clarification, Case PUR-2025-00079 (20 May 2026), retrieved .
- IEEE, Standard 1547-2018 for Interconnection and Interoperability of Distributed Energy Resources, retrieved .
- US DOE Solar Energy Technologies Office, Solar Integration: Distributed Energy Resources and Microgrids, retrieved .
Expert review
Written by the HyreSolar Research team. Not yet reviewed by an outside expert. We say so rather than imply a review that has not happened; see our editorial policy.
How the numbers were checked: Metering, program and export-limit facts were read at the primary source on 8 Oct 2026: Georgia Power’s residential interconnection summary, Santee Cooper Rider DG-25, the Georgia PSC order of 2 Mar 2021, Duke Energy Kentucky’s 2025 Rider NM report and 17.9.568.12 NMAC.
Dominion SC and Virginia items come from the verified sc-local facts file and Virginia input file. The per-home export figure is our division of Duke’s filed totals.
The netting example uses round, labelled inputs. Held for licensed review (G-REV).
Suggest a correction. We fix errors and say what changed.